Approved fees for FY 2020-2021

Stormwater Application Fees

July 1, 2020

Vacant Parcels of Land to be developed:

Stormwater Phase II Post Construction - High Density - (Exceeds 24% impervious surface and land disturbance exceeds one (1) acre) - (New)

$505.00

Stormwater Phase II Post Construction - Low Density (less than 24 % impervious surface  and land disturbance equals one (1) acre) - (New)

$250.00

Expansions or Redevelopment: (increase in impervious surface over 1500 SF)

Stormwater Phase II Post Construction - High Density (Exceeds 24 % impervious surface) (New)

$505.00

Stormwater Phase II Post Construction - Low Density (Less than or Equal to 24 % impervious surface) (New)

$250.00

Revisions to already approved plans:
Stormwater Phase II Post Construction - High Density (increases in the impervious surface from the original submittal) $250.00
Stormwater Phase II Post Construction - Low Density (increases in the impervious surface from the original submittal but does not exceed Low Density limitations) $250.00
Renewals:
Stormwater Phase II Post Construction - High Density Only - (due Every eight (8) years) $505.00
Trip Charge (when a complaint warrants repairs or permits) $50.00/trip
Appeals Advertising Fees Only